Example of exhibition stand construction timeline:
- 3-6 months before the event Ideation brief, concept development, design, and creation of 3D renderings.
- 2-4 months before the event: Preparation of structural drawings.
- 1-2 months before the event: Graphic design and production of printed materials.
- 1-5 weeks before the event: Production of stand structures and furniture.
- 1-3 days before the event: Packing, transportation, setup, and decoration of the stand.
- 1 day before the event: Handover of the exhibition stand to the client.
We Build High-Quality Exhibition Stands
Quality is our hallmark. With the extensive experience and expertise of our production team, we ensure a smooth and efficient build for your trade fair stand.
Our team’s exceptional craftsmanship, construction skills, and state-of-the-art production facilities enable us to create even the most complex stands and custom furniture.
We prepare the structural drawings carefully so that we can guarantee the safety and suitability of each design.
All structures are prepared and packed in our premises, so we can assemble your stand quickly and seamlessly on site during the fair.